Description


Page : 362

Sondrestrom Lidar Operation Log


Operator(s) : E.Gudmundsson, K.Richmond
Purpose : Routine data collection in conjunstion with the IS radar Craig Heinskemans run
Date(s) : 990927 - 990927
File(s) : L9909271 - L9909271
Comments :
Logfile : L9909270.log

Setup:0


Page : 363
[Variables]
Dye Power=75mJ
Rayleigh Power=590mJ

[0]
Iris=max_opening
Rayleigh System=On
Dye System=On
Daystar=Out
Polerizer=In
HalfWave Plates=Tracking
Filter Wheel=2:532(.5nm)

[1]
Iris=not_installed
Rayleigh System=On
Dye System=On
Daystar=In
Polerizer=In
HalfWave Plates=In
Filter Wheel=3:Open

Logsheet:0


Page : 364

Sondrestrom Lidar Operation Log


Log Sheet 1 of 1
Operators : K.Richmond
Date(s) : 990927 - 990927
File(s) : L9909271 - L9909271
FilesTime [UT]CommentsCntSOpe
L990927120:21:15Start of experiment1KR
L990927120:25:54Not sure there's much worth of anything here8441KR
L990927120:31:05Eggert took out the Na beam expander last night, so I'm 6041KR
running w/out it.
L990927120:40:11Sodium Convergence mirror adjusted1KR
L990927120:50:54Going to measure dye pumping power2731KR
L990927120:57:45Dye pumping power: 420 , output power 682361KR
L990927120:59:00I had forgotten to re-open dye pumping beam.2171KR
L990927121:00:00A lot of haze.2171KR
L990927121:03:02Removing Daystar.821KR
L990927121:05:15Daystar out810KR
L990927121:05:32Seeing some Na through it all.760KR
L990927122:10:50Too much haze, no hope in sight, shutting down.100KR
L990927122:12:23End of experiment100KR