Description


Page : 667

Sondrestrom Lidar Operation Log


Operator(s) : E.Guðmundsson
Purpose : test of system after moving the lidar system rack to the old harris room.
Date(s) : 001012 - 001012
File(s) : L10120 - L10121
Comments : Cloudy so no data could be taken but backround with the lasers running. No
ground
loop problems visile on the background data. the telltale slope in background is
absent!.
Logfile : l0010120.log

Setup:0


Page : 668
[Variables]
Dye Power=80mJ
Rayleigh Power=560mJ

[0]
Iris=min_opening
Rayleigh System=On
Dye System=On
Daystar=Out
Polarizer=In
HalfWave Plates=Tracking
Rayleigh Filter=2:532(.5nm)

Logsheet:0


Page : 669

Sondrestrom Lidar Operation Log


Log Sheet 1 of 1
Operators : E.Guðmundsson
Date(s) : 001012 - 001012
File(s) : L10120 - L10121
FilesTime [UT]CommentsCntSOpe
L1012017:37:29Start of experiment98470EG
L1012017:39:43Taking background data to verify the new location of the 0EG
Lidar system rack.
L1012018:22:38Just closed the receiver. 0EG
L1012018:32:09Both beems now exiting, maybe we'll get lucky! Incremented0EG
L1012118:32:410EG
L1012120:03:15End of experiment8050EG