Description


Page : 670

Sondrestrom Lidar Operation Log


Operator(s) : E.Guðmundsson
Purpose : Test of the total system after the move
Date(s) : 001024 - 001025
File(s) : L10240 - L10250
Comments : Fine adjustment of the convergence proving to be difficult on the cource
adjustment on the picomotors. Opened the iris to make convergence adjutment
less critical.

Managed to converge. Halfwave plate adjustment could not be done as the clouds
were to heavy. Things as looking ok!
Logfile : l0010250.log

Setup:0


Page : 671
[Variables]
Dye Power=80mJ
Rayleigh Power=530mJ

[0]
Iris=min_opening
Rayleigh System=On
Dye System=Off
Daystar=Out
Polarizer=In
HalfWave Plates=Tracking
Rayleigh Filter=2:532(.5nm)

[1]
Iris=max_opening
Rayleigh System=On
Dye System=On
Daystar=Out
Polarizer=In
HalfWave Plates=Tracking
Rayleigh Filter=2:532(.5nm)

Logsheet:0


Page : 672

Sondrestrom Lidar Operation Log


Log Sheet 1 of 1
Operators : E.Guðmundsson
Date(s) : 001024 - 001025
File(s) : L10240 - L10250
FilesTime [UT]CommentsCntSOpe
L1024022:12:13Start of experiment15360EG
L1024022:39:46Running with Rayleigh only15360EG
L1024023:38:43The sodium system is on line now11940EG
L1024023:58:37Still0EG
L1024023:59:59Running with both stups now1EG
L1025000:00:45Lots of clouds arround9441EG
L1025000:18:29Wavemeter stable at 589.158nm831EG
L1025002:10:36Clouds are to heavy, shutting down771EG
L1025002:11:41End of experiment771EG