Description


Page : 930

Sondrestrom Lidar Operation Log


Operator(s) : E.Guðmundsson
Purpose : Routine data collection
Date(s) : 011221 - 011221
File(s) : L20011221_000 - L20011221_000
Comments : Lots of haze.

The iris is not installed as I had to remove it for checking alignment. This is the
first run since Jan left and the haze fooled the operator into thinking something
was wrong with the alignment. Will be installed before the next run.
Logfile : l0112210.log

Setup:0


Page : 931
[Variables]
Dye Power=90mJ
Rayleigh Power=460mJ

[0]
Iris=not_installed
Rayleigh System=On
Dye System=On
Etalon=Out
Daystar=Out
Polarizer=In
HalfWave Plates=In
Rayleigh Filter=2:532(.5nm)
Rayleigh seeding=off

Logsheet:0


Page : 932

Sondrestrom Lidar Operation Log


Log Sheet 1 of 1
Operators : E.Guðmundsson
Date(s) : 011221 - 011221
File(s) : L20011221_000 - L20011221_000
FilesTime [UT]CommentsCntSOpe
L20011221_00008:31:31Start of experiment0EG
08:58:29The haze is Still present and getting thicker0EG
L20011221_00013:35:01End of experiment0EG