Description


Page : 0

Sondrestrom Lidar Operation Log


Operator(s) : E.Guðmundsson
Purpose :
Date(s) : 040210 - 040211
File(s) : L20040210_000 - L20040210_000
Comments :
Logfile : l0402100.log

Setup:0


Page : 1
[Variables]
Dye Power=67mJ
Rayleigh Power=430mJ

[0]
front end Iris=3.0mm
Rayleigh System=On
Rayleigh Field stop=2.0mm
Rayleigh path attenuation=0dB
Dye System=Off
Sodium Field stop=2.0mm
Etalon=Out
Daystar=Out
Polarizer=In
HalfWave Plates=Tracking
Rayleigh Filter=2:532(.5nm)
Rayleigh seeding=off

[1]
front end Iris=3.0mm
Rayleigh System=On
Rayleigh Field stop=2.0mm
Rayleigh path attenuation=0dB
Dye System=On
Sodium Field stop=2.0mm
Etalon=Out
Daystar=Out
Polarizer=In
HalfWave Plates=Tracking
Rayleigh Filter=2:532(.5nm)
Rayleigh seeding=off

Logsheet:0


Page : 2

Sondrestrom Lidar Operation Log


Log Sheet 1 of 1
Operators : E.Guðmundsson
Date(s) : 040210 - 040211
File(s) : L20040210_000 - L20040210_000
FilesTime [UT]CommentsCntSOpe
L20040210_00022:24:52Start of experiment0EG
L20040210_00022:25:45Something wrong with the timing - looking at it0EG
L20040210_00022:31:00found the problem - SP laser was triggered off the wrong 0EG
L20040210_00022:31:49signal (due to work on the timing unit - reconection wrong)4910EG
L20040210_00022:39:23Converged Rayleigh and checked waveplates - some 0EG
improvement on the convergence but the plates are optimal7050EG
L20040210_00022:46:08Started sodium system6971EG
L20040210_00023:10:21Clouds moving in1621EG
L20040210_00023:39:23totally overcast01EG
L20040210_00000:05:22End of experiment11EG
L20040210_00000:50:201EG