Description


Page : 1470

Sondrestrom Lidar Operation Log


Operator(s) : E.Guðmundsson
Purpose : Running IR lidar and 532nm lidar at the same time
Date(s) : 040612 - 040612
File(s) : L20040612_000 - L20040612_001
Comments : Ok skies with thin laces of cirrus all around.

Logfile : l0406120.log

Setup:0


Page : 1471
[Variables]
Rayleigh Power=

[0]
front end Iris=not_installed
Rayleigh System=On
Rayleigh Field stop=0.5mm
Rayleigh path attenuation=0dB
Dye System=On
Sodium Field stop=0.5mm
Etalon=Out
Daystar=Out
Polarizer=In
HalfWave Plates=Tracking
Rayleigh Filter=2:532(.5nm)
Rayleigh seeding=off

Logsheet:0


Page : 1472

Sondrestrom Lidar Operation Log


Log Sheet 1 of 2
Operators : E.Guðmundsson
Date(s) : 040612 - 040612
File(s) : L20040612_000 - L20040612_000
FilesTime [UT]CommentsCntSOpe
L20040612_00002:01:56Start of experiment00
L20040612_00002:07:50Running IR at 600V with discriminator at -50mV00EG
L20040612_00002:10:02will run like this for 30min00EG
L20040612_00002:10:31Outside temperature at 8deg.00EG
Note operating conditions on IR. Daystar in the path0
Apperture fully open.
L20040612_00002:15:33Paused the data acq on IR, bringing the HV to 650V and00EG
settign discriminator to -85mV
L20040612_00002:17:20Running again0EG
L20040612_00002:20:34SR430 can not follow on this setting due to signal,0EG
setting HV back to 600V
L20040612_00002:22:24Running again with 600V0EG
L20040612_00002:25:14trying to converge a bit to reduce the signal, can this be0EG
real?
L20040612_00002:29:48just turned the discriminator to -88mV0EG
L20040612_00002:34:45looks like the SR430 is defened at this setting00EG
turning bak to -50mV discriminator
L20040612_00002:37:00Stopping the iris down0EG
L20040612_00002:46:27laser noise causing problmes, corrected trigger source0EG
L20040612_00003:20:18Collecting data again on the IR channel with 0EG
L20040612_00003:21:15Daystar temperature stepped up to two, counts at 10km=220EG
L20040612_00003:25:29turning daystar off, IR counts are referenced at 10km;0EG
L20040612_00003:27:09IR counts 140EG
L20040612_00003:27:56IR counts 210EG

Logsheet:1


Page : 1473

Sondrestrom Lidar Operation Log


Log Sheet 2 of 2
Operators : E.Guðmundsson
Date(s) : 040612 - 040612
File(s) : L20040612_000 - L20040612_001
FilesTime [UT]CommentsCntSOpe
L20040612_00003:28:17IR counts 250EG
L20040612_00003:30:02IR counts 290EG
L20040612_00003:46:37Removing daystar 0EG
L20040612_00003:59:25Running now with 1nm filter, had to stop it severely down0EG
due to high count rate. seeing signal passed 20km
L20040612_00004:03:41opening the iris a tad as Im still within bounds on counts0EG
L20040612_00004:05:13Running with the iris a tad more open, background 0EG
counts at 50 signal counts at 10km 243
L20040612_00004:06:16taking data at this setting for 30min0EG
L20040612_00004:10:29Still some cirrus at 8km interfering 0EG
L20040612_00104:39:03testing if converging improves on the IR signal0EG
L20040612_00104:51:26Lost the skies while tweeking - ending this session0EG
L20040612_00104:51:52End of experiment0EG