Description


Page : 135

Sondrestrom Lidar Operation Log


Operator(s) : E.Gudmundsson
Purpose : Routine data collection coordinated with IS radar
Date(s) : 980819 - 980820
File(s) : L9808194 - L9808202
Comments :
Logfile : l9808191.log

Setup:0


Page : 136
[Variables]
Dye Power=67mJ
Rayleigh Power=560mJ

[0]
90% PMT Iris=not_installed
Rayleigh System=On
Dye System=On
Daystar=In
Polerizer=In
HalfWave Plates=Tracking
Filter Wheel=3:Open

[1]
90% PMT Iris=not_installed
Rayleigh System=On
Dye System=On
Daystar=Out
Polerizer=In
HalfWave Plates=Tracking
Filter Wheel=2:532(.5nm)

[2]
90% PMT Iris=not_installed
Rayleigh System=On
Dye System=On
Daystar=Out
Polerizer=Out
HalfWave Plates=Tracking
Filter Wheel=2:532(.5nm)

Logsheet:0


Page : 137

Sondrestrom Lidar Operation Log


Log Sheet 1 of 1
Operators : E.Gudmundsson
Date(s) : 980819 - 980820
File(s) : L9808194 - L9808202
FilesTime [UT]CommentsCntSOpe
L980819421:19:30Start of experiment5340EG
L980819521:40:19Sodium Convergence mirror adjusted5340EG
L980819521:50:02I ougt to adjust the HWP but the skyes are not clear enough5640EG
L980819522:32:06Rayleigh HG adjusted4560EG
L980819523:39:45Changing to setup 10EG
L980819523:41:24Resumed20311EG
L980819523:45:01Going to adjust halfwave plates while taking data #14420101EG
L980819600:00:05Done adjusting #8 incrementing20101EG
L980820000:01:47counts19781EG
L980820000:52:33Rayleigh Convergence mirror adjusted18621EG
L980820001:11:18The cirrus is growing16341EG
L980820001:22:35Rayleigh Convergence mirror adjusted13531EG
L980820001:39:18SZA=98 changing setup17001EG
L980820001:42:03Running without polarizer17052EG
L980820103:18:41Sodium Convergence mirror adjusted17222EG
L980820205:41:12dye laser HG adjusted. Output energy raised from 58 to 75mJ18002EG
L980820206:25:17Closing down12992EG
L980820206:25:24End of experiment2EG